Beaumont Bridge, Clutha River


Category
Engineering Work (eg road, bridge, sawmill, dam)

Description

One of many bridges over the Clutha River which replaced an earlier structure destroyed in the disastrous flood of 1878, the Beaumont Bridge remains in use as part of State Highway 8.

Completed in March 1887, the Beaumont Bridge is a single lane structure with concrete piers and abutments. An interesting feature of this bridge is that it was the first of four early iron truss bridges made entirely from iron fabricated in New Zealand. Indeed, the contractors, Anderson and Son, railed the material from their base in Christchurch to a small foundry on site, which was established especially for the assembly of the trusses. Later the company repeated this approach, albeit on a larger scale, on their major project for the North Island Main Trunk Railway, the Makatote Viaduct.

The Beaumont Bridge took one year to construct, but the entire project was three and a half years in the making.  When the Beaumont Bridge was eventually completed it was described as “a lasting monument of the undoubted excellence of New Zealand workmanship.”


References
G. Thornton, Bridging the Gap: Early bridges in New Zealand, 1830-1939, Auckland, 2001, pp.132-33

‘The Beaumont Bridge,’ Tuapeka Times, 16 February 1887, p.3

‘The New Beaumont Bridge,’ Otago Daily Times, 9 March 1887, p.4


Attachments

No Attachments

Location

Clutha River, State Highway 8 at Beaumont, South Otago.



Region/s
Otago

Access Info
This bridge is part of the state highway network and is open to vehicle traffic. Side roads at either end of the structure provide river bank access and an opportunity to view the bridge.

Nature of Engineering
Infrastructure (incl. Road, water, ports), Building and Construction, Transport (Road, sea, air, incl vehicles)

Lat: -45.818487 Long: 169.527377